By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Newsunplug KenyaNewsunplug KenyaNewsunplug Kenya
  • News
    • Metro
    • Politics
    • Business
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
Reading: Why It Took 17 Days For Rescuers In India To Get To 41 Workers Trapped In A Mountain Tunnel
Share
Notification Show More
Font ResizerAa
Newsunplug KenyaNewsunplug Kenya
Font ResizerAa
  • News
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
  • News
    • Metro
    • Politics
    • Business
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Newsunplug Kenya > Blog > News > Why It Took 17 Days For Rescuers In India To Get To 41 Workers Trapped In A Mountain Tunnel
News

Why It Took 17 Days For Rescuers In India To Get To 41 Workers Trapped In A Mountain Tunnel

hallanaija
Last updated: November 28, 2023 8:10 pm
hallanaija
2 years ago
Share
SHARE

Indian rescuers faced repeated and unexpected setbacks during the 17 days they dug through a mountain in the country’s north to reach 41 construction workers trapped after a tunnel collapsed there earlier this month.

NEW DELHI — The rescue mission was expected to last only a few days. Instead, it took 17 days to reach 41 construction workers who were trapped when a landslide collapsed a mountain tunnel in northern India earlier this month.

The excruciating wait finally ended at nightfall on Tuesday, as temperatures dropped near the accident site in the mountainous state of Uttarakhand. Everyone was pulled out alive.

But beyond the jubilation and relief, questions remain as to why what became one of the most significant and complicated rescue operations in India’s recent history — aided by international tunneling experts and spearheaded by multiple rescue agencies — took so long.

News of the trapped workers spread fast after a Nov. 12 early morning landslide caused a portion of the 4.5-kilometer (2.8-mile) Silkyara Tunnel they were building near the town of Uttarkashi in Uttarakhand state to collapse about 200 meters (650 feet) from the entrance.

READ MORE  Women's rights advisor Chiggai condemns murder of 17-year-old Wajir girl

No one was seriously injured or killed in the collapse but the engineers on the team knew they had their task cut out for them. They had to penetrate through rocks and metal to reach the workers trapped behind a wall of nearly 60 meters (197 feet) of debris.

At first, the rescuers tried to reach the trapped workers — all poor migrant laborers from across the country — by drilling horizontally through the debris, in a straight line, using excavators and drilling machines. But the drilling machine broke down multiple times, frustrating the efforts of the rescuers who were working 24-hour shifts.

They went on digging horizontally by replacing the machine, and 10 days into the mission, a small camera was sent through a narrow pipe that captured initial images of the workers stuck in the tunnel. All were doing OK and hopes for their rescue grew.

The rescuers saw their hopes dashed on the thirteenth day of the operation, when their drilling machine broke down beyond repair. They had less than 20 meters (66 feet) to go in the digging.

READ MORE  Osoro denies bribing Azimio MPs to skip Finance Bill vote, says he only bought them soup

The families of the trapped workers grew anxious. Some were starting to panic.

The rescuers put an alternate plan in motion and began drilling from the top of the mountain — a path that required digging nearly twice the distance of the horizontal shaft.

The trapped workers, who were in the meantime being supplied with food and oxygen through a narrower pipe, were at the risk of falling sick. Officials who kept watch near the tunnel, and even local residents, began offering prayers at a small makeshift Hindu temple in the area, seeking divine help.

The clock was ticking and the engineers realized they could not give up on the horizontal drilling path, even as the vertical drilling began.

On Monday, they called in a team of miners to dig by hand the final stretch of the path and clear the way for a passageway to be made of welded metal pipes. Once the pipes were in place, rescuers pushed through the dirt and rocks.

By Tuesday, they had drilled through more than 58 meters (190 feet). The plan was to pull out the trapped workers one by one, on wheeled stretchers through the pipes.

READ MORE  42,927 students placed in national schools as CS Machogu releases official list

Almost 24 hours later, all the 41 men were out.

Nakuru combats falsehoods to boost use of the HPV vaccine
Ruto rallies support for Raila during meeting with presidents of Mali and Togo.
CJ Koome instructs Magistrates’ Courts to conclude cases pending for over 3 years.
Governor Wavinya, who is being held in the UK, disputes claims that she smuggled millions.
President Putin linked to London-educated ‘Barbie’ who he is 32 years older than (photos)
Share This Article
Facebook Email Print
Previous Article Jimmy Carter Attends Memorial Service For Wife Of 77 Years, Rosalynn Carter
Next Article FIFA U17 World Cup: France to face Germany in final
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

about us

We influence 20 million users and is the number one business and technology news network on the planet.

Recent Posts

  • Another police killing: 19-year-old bystander shot dead during protests in Mwiki
  • Goons and chaos are not my politics, Sakaja calls for peaceful protests
  • Toll in lynching of Nigeria wedding guests rises to 12
  • At least 8 de@d as hot air balloon carrying 22 people bursts into flames and crashes (videos)
  • Gunmen kill two, including bride, at France wedding party

Recent Comments

No comments to show.
Newsunplug KenyaNewsunplug Kenya
© Newsunplug Kenya. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?