By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Newsunplug KenyaNewsunplug KenyaNewsunplug Kenya
  • News
    • Metro
    • Politics
    • Business
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
Reading: The government proposes to build a BRT line for Ksh7.6 billion along the Outer Ring Road.
Share
Notification Show More
Font ResizerAa
Newsunplug KenyaNewsunplug Kenya
Font ResizerAa
  • News
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
  • News
    • Metro
    • Politics
    • Business
  • Entertainment
  • Lifestyle
  • Sports
  • Tech
  • Spotify
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Newsunplug Kenya > Blog > Metro > The government proposes to build a BRT line for Ksh7.6 billion along the Outer Ring Road.
Metro

The government proposes to build a BRT line for Ksh7.6 billion along the Outer Ring Road.

Ivy Irungu
Last updated: September 24, 2024 8:31 am
Ivy Irungu 8 months ago
Share
SHARE

The Kenya Urban Roads Authority (KURA) has invited bids from eligible contractors for a significant project aimed at improving one of the city’s most dangerous roads.

The project involves the construction of a two-lane Bus Rapid Transit (BRT) line along the entire length of the Outer Ring Road in Nairobi County, which is approximately 10.5 kilometers long. It includes the construction of three river bridges and two overpass bridges, measuring about 1,024 meters and 323 meters, respectively, as well as 13 BRT stations.

Additional specifications for the project include:

– Construction of new footbridges and modifications to existing ones
– Installation of electro-mechanical works
– Development of a drainage system along the road
– Street lighting and landscaping improvements along the Outer Ring Road

The contractor will also be responsible for building a BRT depot with a floor area of approximately 1,365 square meters, including parking spaces, access roads, fences, and drains.

It is important to note that the project is restricted to firms from Korea, and the work must be completed within a 24-month timeframe.

READ MORE  60-year-old man dies by suicide in Kirinyaga

You Might Also Like

Radio boss fined Ksh.6k for assaulting female colleague over ad commission

Nine people are killed and two are seriously injured as a matatu tire bursts on the Narok-Bomet road.

Limuru: 3 factory officials arrested for forcing all female workers to undress

Kiambu: Woman allegedly kills 5-month-old son

Three people shot in Umoja after supporters of Embakasi West MP Mwenje, George Theuri clash

Share This Article
Facebook Twitter Email Print
Previous Article Kemis system was introduced two months ago, but it hasn’t been put into use.
Next Article Advocates for more female participation in decision-making
about us

We influence 20 million users and is the number one business and technology news network on the planet.

Recent Posts

  • “Na hii urembo yote’ – Netizens react as a Slay Queen working in cahoots with phone snatchers in Nairobi CBD is nearly lynched (PHOTOs)
  • I’m leaving Bayer Leverkusen – Xabi Alonso confirms ahead of Real Madrid switch
  • Liverpool superstar, Mohamed Salah is named FWA Footballer of the Year
  • #EPL: Paul Merson predicts Liverpool vs Arsenal, Newcastle vs Chelsea, other fixtures
  • Outrage after Bungoma High Court allowed contractor to auction Matili Institute’s assets

Recent Comments

No comments to show.
Newsunplug KenyaNewsunplug Kenya
© Newsunplug Kenya. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?